Final list of things that need to be done.-Paint CP box (damn weather, been raining all week)
-Install exctraction fans. Done 4/12/05-Mount on/off switch under control panel
-Finalise marquee & sideart designs and get printed.
-Cut and fit marquee Lexan
-Wire coin door and fit barrel locks
-Wire dashboard speakers.
-Fit coin tin (Looking for a steel baking tray I can just drop in place)
-Mount all hardware inside cab and tidy wiring
-Install marquee speaker grills
-Redo dashboard access panel (May end up now going for a non lockable panel)
-Install T-molding (Considering my ---Cleveland steamer--- T-molding groove I think this may be a real nightmare.)
-Continue testing front ends.
I think this is everything!
