Hey Breaker,
The new vendor I chose has turned out to be just as slow (if not slower) than the first. While the initial test-run samples I got from them turned out beautifully, the production run samples have been ...uh, how shall I put this...totally unacceptable. Yeah, that's about as nice as I can put it. To date, I've had to nix the production run samples three or four times.
Aside from the troubles listed above, the controller is ready to go. All of the parts have been milled, machined, cast, etc...and all I'm waiting on is the powder coating on the frame components and handles. I'm about to update the site with an expanded list of SW parts which are now available, but the completed controller won't be available until I can get beyond this finishing issue with the powder coating.
I've been strongly considering purchasing a medium sized powder coating setup and doing the work myself. I have the room in the shop and it sure would be nice to have one less process to job out. The actual process can't possibly be as difficult as these string of vendors make it appear.
So, to sum up, the yoke is nearly complete. I'm still waiting on the last and final process before they're assembled and shipped. The website will be updated with an expanded list of components which are now available. Pay particular attention to the gears and the rebuild kits if you have an existing controller in need of repair. :-)
David