so i'm hafway through my build now
i have my Mame buttons, and all the graphics,
i have my plans that i finelized...
i have my iPec2 bored
i'm waiting for my joysticks and new swiches i bought (didn't like the old swiches that came with the led buttons)
and overall it took me around 2, 2.5 months to do just that...
and i'm thinking it takes forever this build... i thought it's going to take me 2 months top for my whole project, now i'm thinking it's going to take more like
5, 6 months (the parts are expensive so i'm ordering every month or so a cupple of them also who has time ? the graphics alone was a month work)
how much time do you guys took with your first build ?
is 5, months normal for a full mame cabinet ?