Just going to record time and materials for build I'm just starting:
Day1:
Cabinet pickup: 2.5 hrs (there and back). Also stopped at starburst on way through
cabinet cost: $125 (u2000 monitor and golden tee fore boards inside-will sell later)
Controls cost: $45 ipac, $25 new happs sticks, $26 new buttons
Day 2:
clean-up: 1 hr (removed wiring, control panel overlay, stupid iso transformer double bolted to bottom, back door, misc screws etc.
repaired monitor: 1.5 hours--new cap kit, trial and error on repairs finally got it rock solid. Cap kit $10
Day 3: 40 minutes there and back picked up 26" Lcd tv. $75