Main > Project Announcements
touch screen wall mount jukebox build
hobsonschoice:
all bits cut
hobsonschoice:
Monitor position test. Usb cable and touch panel controller all connected.
A note on the panel, It is a 70€ kit from ebay which takes all of about 10 mins to install, just install the controller drivers that come with the kit and place the panel over the monitor. Once you have it running, use double sided tape to stick to the monitor but avoid taping within the outlined frame of the circuitry. When you get one you'll see what i mean.
hobsonschoice:
Used an old plastic bread board as a motherboard mount. Screwed holes through it and aligned holes with the back of the monitor housing so with two screws i could attach the motherboard to the back of the monitor. cabled strapped MoBo down and secured VGA board and Hard drive.
hobsonschoice:
Primed front panel and also decided back panel did not have to be a complete panel but rather a frame for the rear of the cab.
hobsonschoice:
Back frame
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version