UPDATE - 100% Complete Finally got the cabinet home on Monday night after painting was done. First task that night was to get the t-molding on...
Next up was the installation of the speakers that I salvaged from the Sony TV I'm using. The TV's audio system is being used instead of an external computer audio speaker system.
The coin door was next...
...then the control panel...
...which got me to this point.
After that I put in the marquee lighting which is
cold cathode light bars and installed the retainers.
Monday night my brother-in-law came over and helped me with the most difficult part - installing the monitor. The cabinet had to be laid down face first and the monitor lowered into the mounting frame from the back side. It actually went very smoothly!
Here's where the cabinet stood at the end of Monday night.