Main > Main Forum
The never ending Project Thread
rackoon:
My list:
finish hand digging 50 foot 3' wide and 3' deep septic line trench
finish 700 ft horse fence
pour slab for new hot tub sitting in driveway
build roof over hot tub before the snow season
finish framing 900 sq ft barn
return 4th xbox this month to walmart
compile portfolio for job interview next week
replace glow pugs in dead Chevy sitting in driveway
rent tractor and cut into mountain to make room for authentic Irish pub in forrest behind house
(THINGLS THAT WILL MOST LIKELY GET DONE)
INSTALL 27" MONITOR INTO MY COCKTAIL CAB
GET DRUNK AND PUT OFF ALL PROJECTS TILL TOMAROW
Hildy_42:
I am glad to see that I am not the only one with a wife that makes sure my list is up to date with the latest projects for our house. Some how or another my arcade and game related projects all get pushed to the very end or most of the time are not even allowed on the list.
The biggest one that I keep trying to push out is the painting of the inside of our house. Not a big fan of painting and too cheap to pay someone else to do it.
Oh well it is always fun to see that everyone else is in the same boat as I am.