this is my basement, not the room PBJ called my rape dungeon (which is my garage) I took a brazillion pictures, but I only posted the highlights.
So I started by framing out a utility room.
Then after I did all that I framed out the bathroom: (not shown jack hammering up the concrete to move the sink/toilet drains that were roughed in wrong by the builders)
Then drywall went up (not shown, all the plumbing and electrical)
spackle tape etc
primed:
painted:
flooring and most of the baseboard in:
Not shown in the previous pix were the rounds of patching, sanding, and paint touch ups.
Bathroom area-
You can see the concrete patching between the 1st and 3rd chalk lines
tiled, grouted and sealed: (not shown how much ---smurfing--- work a tile job is)
fin:
Not shown, stand up shower install, terlet installation, and putting in that vanity. Everything is sealed and water tight.
opposite all that work is where the games are:
things moved since the last pic I put up of the game room. Windows need painted and curtains need put up too.