Main > Project Announcements
Greenman's Jukebox Build - Finally Finished!
<< < (10/26) > >>
Greenman:
A little more done. 



I cut a hole.


I used the router.




Perspex fits.


This is the colour.  I will diffuse the light coming through the hole with some lightbox perspex on the inside.





So the job I was dreading and putting off only took an hour or two and was fairly straight forward.  Onward and upward.
J_K_M_A_N:
Looks fantastic! Great work. I cannot wait to see it finished.

J_K_M_A_N
Greenman:
Thanks J_K_M_A_N



More detail.  A bunch of sticks.


Gluing a bunch of sticks



Then I did some filling and sanding.  Then......


Undercoat


It goes about here.
matsadona:
Wow... been away for a while and get back to see this. Amazing  :applaud: Now I must find some time to start my own build...
Greenman:
Thank you matsadona.  That's very kind.

I think I need a better program to alter the size of the images.  This one gives really poor image quality (Everything is actually square).  Anyway.....

All sanded, and ready for some paint...







The two ends of the grill have been grinder back 12mm to accomodate the polished aluminium edging.  She should look a bit different with her colours on.

Monitor mounts are in.  I have also ordered the toughened glass for the front and top as well as the clear and opal perspex for the control panel.  Just touching up the graphics for the front translite.  Oh, and I had to order some square buttons to go with the rectangle ones as the original plan was to just use rectangle. 

Anyway....onward and upward.
Navigation
Message Index
Next page
Previous page

Go to full version