Main > Everything Else |
The Summer of Chuff 2015 |
<< < (98/198) > >> |
BadMouth:
Quite chuffed to be done with the dust. Ceiling tiles and furring strips ripped down, water damage around window fixed, lumpy misshapen archway ripped out and redone, 80's in-wall air conditioner removed, paneling removed from "accent wall", ceiling light added, sconces added (both on dimmers), drywall smoothed out, new outlets/covers. I'm chomping at the bit to replace the interior doors and get the floors redone, but have to wait until the main structural beam in the basement is replaced. Actually I should have waited to do the drywall, but if it cracks when the house is jacked up to install the beam, then it will just be a few small spots to fix and the rest will already be done. The contractor I have lined up is falling behind on his other jobs and nobody else is available. Gonna take this Saturday off. :) (...and then Sunday start reorganizing the basement for the beam repair) |
yotsuya:
Looks great, BM. If you guys don't here from me this weekend, it's 'cause this mofo is.... |
eds1275:
I'm chuffed that the nti chuff thread is only like 3 pages and this one is in the double digits. |
wp34:
--- Quote from: yotsuya on July 10, 2015, 01:42:02 pm ---Looks great, BM. If you guys don't here from me this weekend, it's 'cause this mofo is.... --- End quote --- They have fish in Arizona? |
wp34:
That turned out great. Something about your picture reminds me of the Standing Hampton album cover. --- Quote from: BadMouth on July 10, 2015, 12:13:55 pm ---Quite chuffed to be done with the dust. Ceiling tiles and furring strips ripped down, water damage around window fixed, lumpy misshapen archway ripped out and redone, 80's in-wall air conditioner removed, paneling removed from "accent wall", ceiling light added, sconces added (both on dimmers), drywall smoothed out, new outlets/covers. I'm chomping at the bit to replace the interior doors and get the floors redone, but have to wait until the main structural beam in the basement is replaced. Actually I should have waited to do the drywall, but if it cracks when the house is jacked up to install the beam, then it will just be a few small spots to fix and the rest will already be done. The contractor I have lined up is falling behind on his other jobs and nobody else is available. Gonna take this Saturday off. :) (...and then Sunday start reorganizing the basement for the beam repair) --- End quote --- |
Navigation |
Message Index |
Next page |
Previous page |